Projects Completed By PRO

Check out the latest projects we have been working on IN 2024. 

SAFETY     //    QUALITY     //   PERFORMANCE 

PRO PIPELINE // COMPLETED PROJECTS

Oakland resilience Interconnect


26” Station Project

32nd & Richland


ITHACA REGULATION STATION


MID-MICHIGAN ABANDONMENT


HEALD & PENN


PLAINWELL


LAKE LANSING RUTHERFORD


CHELSEA WETLAND PROJECT


  • Consumers Energy Demolition Projects

    Pro Completed 8 regulation station demolitions for Consumers Energy.

  • Demolition Bay City

    Pro Pipeline Demolishing Brick Building.

    Dust controls in place to protect the Community & Environment.

  • Lansing RS Rebuild

    Lansing RS Rebuild

    New Station Installation

  • RNG Tap Site

    RNG Tap Site

    Completed Top Coat on station piping.

  • Control Work Before Station Demo

    This Project required Pro to install Pressure Control fitting to stop the flow of gas to the station before demo. Also included in this scope was Fabrication, Nitrogen Pressure Testing & 30’ of new sidewalk.

  • Consumers Energy Painting Project

    Completed Top Coat in CE Green

  • Consumers Energy Station Retirement

    Pro Pipeline In-Service welded 2” PCF to isolate the station. Pro then demo’d the station and restored the ROW with high performance erosion blanket.

  • Consumers Energy Compression Station

    Pro Pipeline Coated 800’ of above grade 26” pipe. This project was especially challenging due to the flow conditions of the station. Pro had to create a schedule to allow for suction and discharge of the in-service Compression station. All metrics were tracked on Pro Pipeline Coating report including, Conditions, Anchor Profile, Mills per coat, and Final DFT.

  • Regulation Building Demo Consumers Energy

    Pro Pipeline ALWAYS uses dust mitigation with any Demolition project. Protecting the Environment, Community, and Employees is our TOP priority.